Project Pipeline

We are currently working on three biomass projects. These projects will generate electricity and heat using anaerobic fermentation to generate biogas.

The projects include:

Project no. 1

 

  • 3 MW Power project.
  • Industrial waste with captive load of 2MW
  • High BOD and COD.
  • Strong Company = solid off-taker for 2MW
  • Will buy power at $0.12 to $0.15 per kWh
  • Large scope for water treatment as well.CAPEX: $11MM        
  • ROE: 18%
Project No. 2
  • Size 1MW
  • Power plant near industrial zone.
  • Feedstock grown by local farmers specifically for power gen.
  • Will buy power at $0.12 to $0.15 per kWh
  • Opportunity to resell fertilizer to farmers.CAPEX: $5.5MM
  • ROE: 18%
Project No. 3
  • 10 MW Agricultural Waste from agro-processor
  • 1MW Captive load.Will buy power at $0.12 to $0.15 per kWh
  • Remaining 9MW to feed into the grid.
  • Large scope for water treatment.
  • CAPEX: $37MM
  • ROE: 18%